Essential Site Maintenance: Authorea-powered sites will be updated circa 15:00-17:00 Eastern on Tuesday 5 November.
There should be no interruption to normal services, but please contact us at [email protected] in case you face any issues.

loading page

Influence of Flood Diversion on Discharge and Peak Water Levels at an H-shaped Sixianjiao Node in the Pearl River Delta, South China
  • WW
WW

Corresponding Author:[email protected]

Author Profile