Experimental study on fracture properties of dam concrete under post-peak cyclic loading based on DIC and acoustic emission techniques
  • +2
  • Jingwu Bu,
  • Huiying Xu,
  • Xinyu Wu,
  • Xudong Chen,
  • Bo Xu
Jingwu Bu
Yangzhou University

Corresponding Author:[email protected]

Author Profile
Huiying Xu
Yangzhou University
Author Profile
Xinyu Wu
Yangzhou University
Author Profile
Xudong Chen
Hohai University
Author Profile
Bo Xu
Yangzhou University
Author Profile

Abstract

In order to study the fracture properties of dam concrete under post-peak cyclic loading, wedge splitting tests with three loading rates (0.001 mm/s, 0.01 mm/s, 0.1 mm/s) were performed on notched cubic dam concrete specimens. Meanwhile, the acoustic emission (AE) and digital image correlation (DIC) technologies were used to record the crack propagation process of specimens. Test results show that the fracture of dam concrete has a significant rate effect: with the loading rate increases, the peak load increases, the slope of the post-peak P-CMOD curve gradually decreases and the stiffness degradation of dam concrete becomes more serious. The cumulative AE count shows a step increasing trend and has a Kaiser effect. The Kaiser effect decreases with the post-peak cyclic loading procedure, and with the loading rate increases, the Kaiser effect increases. With the increasing of loading rate, AE energy fluctuates violently and b value fluctuates frequently, indicating the damage of dam concrete becomes more serious. As the loading procedure, the damage of the specimen accumulates gradually, and the strain recovery rate decreases gradually. With the loading rate increases, the strain recovery rate decreases and the permanent crack increases. Based on the fictitious crack model, the effective crack length shows a gradual and steady rising trend. As the loading rate increases, the growth rate of the effective crack length becomes large.
12 Nov 2021Submitted to Fatigue & Fracture of Engineering Materials & Structures
17 Nov 2021Submission Checks Completed
17 Nov 2021Assigned to Editor
01 Dec 2021Reviewer(s) Assigned
31 Dec 2021Review(s) Completed, Editorial Evaluation Pending
07 Jan 2022Editorial Decision: Revise Major
26 Feb 20221st Revision Received
26 Feb 2022Submission Checks Completed
26 Feb 2022Assigned to Editor
02 Mar 2022Reviewer(s) Assigned
27 May 2022Review(s) Completed, Editorial Evaluation Pending
28 May 2022Editorial Decision: Revise Major
14 Jun 20222nd Revision Received
14 Jun 2022Submission Checks Completed
14 Jun 2022Assigned to Editor
15 Jun 2022Review(s) Completed, Editorial Evaluation Pending
16 Jun 2022Editorial Decision: Accept
Sep 2022Published in Fatigue & Fracture of Engineering Materials & Structures volume 45 issue 9 on pages 2646-2661. 10.1111/ffe.13779