Abstract

Soil salinity has today become a highly disastrous phenomenon that is responsible for crop failure worldwide and specially in countries with low farmer incomes and food insecurity. Soil salinity is often caused due to water accumulation in fields due to unscientific flood irrigation wherein plants intake the water leaving salts behind. It is, however, the sub-surface soil salinity that affects the plant growth. These salts in sub-surface soil get trapped in root nodules of plants and prevent further water intake. There have been very few studies conducted for sub-surface soil salinity estimation. Hence this study aims to estimate sub-surface soil salinity (at 60 cm depth) for early stage of wheat crop growth in a simplified manner using freely available satellite data, which is a novel feature and prime objective in this study. The study utilizes Sentinel-1 SAR (Synthetic Aperture RADAR) data for backscatter coefficient generation, Sentinel-2 multispectral data for NDSI (Normalised Differential Salinity Index) generation and on ground equipment for direct collection of soil electrical conductivity. The data were collected for two dates in November and December 2019 and one date for January 2020 during the early stage of wheat crop growth. The dates were selected keeping in mind the satellite pass over the study area of Rupnagar on the same day. Ordinary Least Squares regression was used for modelling which gave R2-statistics of 0.99 and 0.958 in training and testing phase and root mean square error of 1.92 in modelling for soil salinity estimation.
26 Aug 2020Submitted to Land Degradation & Development
26 Aug 2020Submission Checks Completed
26 Aug 2020Assigned to Editor
30 Aug 2020Reviewer(s) Assigned
05 Jan 2021Review(s) Completed, Editorial Evaluation Pending
14 Jan 2021Editorial Decision: Revise Major
28 Jan 20211st Revision Received
30 Jan 2021Submission Checks Completed
30 Jan 2021Assigned to Editor
19 Apr 2021Review(s) Completed, Editorial Evaluation Pending
06 May 2021Editorial Decision: Revise Major
07 May 20212nd Revision Received
10 May 2021Submission Checks Completed
10 May 2021Assigned to Editor
10 May 2021Review(s) Completed, Editorial Evaluation Pending
14 May 2021Editorial Decision: Revise Minor
14 May 20213rd Revision Received
17 May 2021Submission Checks Completed
17 May 2021Assigned to Editor
17 May 2021Review(s) Completed, Editorial Evaluation Pending
17 May 2021Editorial Decision: Accept